2018 Regulator 31 Change Order
|Orange Beach, AL
$258,990
It'll be a tough task to find a 2018 Regulator 31 in this good of shape, as she shows extremely well. The first thing to know on this 31 is that her actual length with the bracket is 36'5"...she looks and feels way bigger then her model designator. She has been dry-stored out of the sun and used minimally by her current owner. Only 403 total operating hours on this 31 and she's powered by two trusty bulletproof 300 Yamahas.
Bonus Optimus Joystick steering with SetPoint (GPS holds you in place). Fan-favorite side entry door a plus, too. Plenty of seating, including bow backrests, captain's seats with individual footrests, and a rear flip-up seat, which stows for more cockpit space. She had SeaDek installed last season and the decking is in fantastic shape. Great teak color adding some pop to her all-white hull. The color scheme is ideal...classic full white hull, and for those who prefer no chipped powder coat, she is equipped with anodized pipes...always a plus in our eyes when a boat has no powder coat. We actually order our stock Albury Brothers without powder coat, as well. Less is always more over time :)
She is tastefully outfitted..here is a list of highlights:
- 2x Garmin 8616xsv MFDs
- Garmin Radome
- Optimus 360 Joystick Steering with Auto-Pilot
- Garmin VHF
- JL Audio Amp & Sub / Polk Audio Head Unit
- Windlass Anchor
- Yamaha Command Link Plus LCD Gauge Display
- Push-button stop/start
- Lenco trim tabs with indicator switch
- 360 degree outriggers
- Raw & fresh water washdowns
- Massive forward fish box
- Newer Seadek throughout
- Side entry door (starboard side)
- LOA with bracket of 36'5"!!
- NO Trailer Included, but we can order one
Financing available, as always.
For Immediate Delivery:
2018 Regulator 31 Center Console
Twin 2018 Yamaha F300NCAs (Fly-by-wire, 403 Hours)
No Trailer (But we can order upon request via Amera Trail, Magic Tilt, or McClain)
Call Jarett and his sales dog, Riggs, @ 251-980-BOAT!
We are the largest pre-owned boat lot on the beach....located at Zeke's Landing in Orange Beach, AL. We are a full-service dealership that prides ourselves on transparency and a smooth sales process. We assign professional eyes and hands to every vessel we represent and strive for clarity. Financing available with rate specials changing weekly. Happy boaters buy and sell with Orange Beach Boat Sales @ Zeke's Landing!
Used Boat Sales, Done Right. NEW Boats from Albury Brothers.
*These are professional photos taken in high-resolution, as we want you to have the ability to zoom-in and see even the finest of details. Clarity is key when shopping for a pre-owned boat, and this is one of several transparent steps we take to provide you with correct buying information. Shop and BUY with confidence!
Disclaimer
We provide this yacht listing in good faith, and although we cannot guarantee its accuracy or the condition of the boat. The South Jersey Yacht Sales - CCM is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Orange Beach Boat & Yacht Sales @ Zeke's Landing & Marina. She is subject to prior sale, price change, or withdrawal without notice and does not imply a direct representation of a specific yacht for sale.
MANUFACTURER: Regulator
BOAT TYPE:
MODEL: 31
HULL MATERIAL: Fiberglass
YEAR: 2018
CATEGORY: Power
BEAM: N/A
LENGTH: 31.33 / 9.55 m
DRY WEIGHT: 10,800 lb
ENGINE 1
MAKE: YAMAHA
MODEL: F300NCA
FUEL: unleaded
POWER: 300 HP
TYPE: Outboard
HOURS: 403
LOCATION: Starboard
DRIVE: N/A
PROPELLER TYPE: 3 Blade, Stainless Steel
YEAR: 2018
ENGINE 2
MAKE: YAMAHA
MODEL: F300NCA
FUEL: unleaded
POWER: 300 HP
TYPE: Outboard
HOURS: 403
LOCATION: Port
DRIVE: N/A
PROPELLER TYPE: 3 Blade, Stainless Steel
YEAR: 2018
FUEL TANK CAPACITY: 300 gallons
FUEL TANK COUNT: 1
WATER TANK CAPACITY: 35 gallons
WATER TANK COUNT: 1
HOLDING TANK CAPACITY: 6 gallons
HOLDING TANK COUNT: 1
Joystick Control
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.