2012 Formula 37 Performance Cruiser Change Order

|

Jersey City, NJ

$235,900

yacht-length Length
37
yacht-beam-length Beam
11.92 ft
yacht-engine-make Engine Make
Volvo Penta
yacht-engine-power Engine Power
660 HP
View More Listings
First Name(Required)
Last Name(Required)
This field is hidden when viewing the form
This field is hidden when viewing the form
Get the latest and greatest on the 2012 Formula 37 PC with Repowered - IPS D6 engines with about 330 hours -Brand New Pods, New transmissions, New SUS modules (steering), laser aligned and updated by Volvo certified technician. 
Electrical D/C and A/C
  • Generator Diesel Westerbeke 7.6
  • 4 Batteries
  • 30 amp with 120 V
  • Battery Charger 
Air Conditioning 
Saloon: Model No:SVCD18 KHV, BTU: 18,000
Cockpit: Model No: VTD16K BTU: 16,000

Navigation and Helm Appointments
  • NEW 2021 Upgraded Garmin Package -GPS Chartplotter - 8616 XSV, Fantom X 24" Dome Radar, Track Vision, FLIRR, Fusion stereo with speakers - all linked together.
  •  Joystick 
  • VHF - ICOM M-412 with Digital Selective Calling (DSC)
  • Autopilot 
  • Compass 3 1/2" Ritchie
  • Spotlight - Go Light
Entertainment
  • Three TVS -Main Saloon: Toshiba 26" Flat Screen, Forward Cabin: Toshiba 19" Flat Screen Aft Cabin: Toshiba 19" Flat Screen
  • New 2021 Fusion stereo with speakers
  • Underwater lights 
Cabin Amenities
  • Foward and Aft berth
  • Galley: Isotherm Fridge 1130BB - fridge and freezer
  • Central Vacuum
  • Kenyon Stove - 2 burner 
  • Panasonic Microwave
  • Vacu-flush head 
Canvas and Upholstery
  • Updated 2021 - Strata-glass across the windshield 
  • Drop curtain with eisenglass and screen
  • Cockpit and Cabin upholstery is in great condition
Owner purchased the boat in 2021 and has all service records since purchasing. 
Let Our Experience Improve Your Experience! Get It Right At Al Grover's Marine!  

Disclaimer

We provide this yacht listing in good faith, and although we cannot guarantee its accuracy or the condition of the boat. The South Jersey Yacht Sales - CCM is pleased to assist you in the purchase of this vessel. This boat is centrally listed by AL GROVER'S. She is subject to prior sale, price change, or withdrawal without notice and does not imply a direct representation of a specific yacht for sale.

MANUFACTURER: Formula

BOAT TYPE: Express Cruiser

MODEL: 37 Performance Cruiser

HULL MATERIAL: Fiberglass

YEAR: 2012

CATEGORY: Power

BEAM: 11.92 ft

LENGTH: 37 / 11.28 m

DRY WEIGHT: N/A

ENGINE 1

MAKE: Volvo Penta

MODEL: 450 IPS

FUEL: diesel

POWER: 330 HP

TYPE: Inboard

HOURS: N/A

LOCATION: N/A

DRIVE: Pod

PROPELLER TYPE: N/A

YEAR: 2012

ENGINE 2

MAKE: Volvo Penta

MODEL: 450 IPS

FUEL: diesel

POWER: 330 HP

TYPE: Inboard

HOURS: N/A

LOCATION: N/A

DRIVE: N/A

PROPELLER TYPE: N/A

YEAR: 2012

FUEL TANK CAPACITY: 236 gallons

FUEL TANK COUNT: 2

WATER TANK CAPACITY: 55 gallons

WATER TANK COUNT: 1

HOLDING TANK CAPACITY: 57 gallons

HOLDING TANK COUNT: 1

Disclaimer
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.

Similar Listings

2006 Formula 40 Performance Cruiser

Point Pleasant, NJ

$ 139,000.00

2013 Formula 400 Super Sport

Fort Lauderdale, FL

$ 309,000.00