2005 Boston Whaler 305 Conquest CHANGE ORDER

|

San Diego, CA

$125,000

yacht-length Length
30
yacht-beam-length Beam
10.58 ft
yacht-engine-make Engine Make
Mercury
yacht-engine-power Engine Power
500 HP
View More Listings
First Name(Required)
Last Name(Required)

Extremely Clean 2005 Boston Whaler 305 Conquest – Twin Mercury 250s & Full Garmin Package

Vessel Overview
This turn-key 2005 Boston Whaler 305 Conquest combines offshore fishing capability with cabin amenities. Powered by Twin Mercury Verado 250 HP outboards and equipped with a Garmin navigation package, this boat is ready for immediate offshore runs or extended weekend cruising.

Maintained in exceptionally clean condition, this unsinkable hull offers a deep-V entry, spacious cockpit layout, full eisenglass helm enclosure, and air-conditioned cabin that sleeps four comfortably.

Propulsion & Mechanical

  • Engines: Twin Mercury 250 HP Outboards
  • Engine Hours: 1,000 
  • Controls: SmartCraft Digital Throttle & Shift (DTS) / Mercury Controls
  • Trim Tabs: Electric trim tabs with helm control panel
  • Steering: Hydraulic power-assisted steering
  • Air Conditioning / Heat in cabin

Navigation & Garmin Electronics

  • Chartplotter / MFD: Garmin GPSMap XSV 18" multi-function display 
  • Radar: Garmin 18" 4KW Closed Dome Radar 
  • Sonar / Fishfinder: Garmin CHIRP Sonar transducer module
  • Autopilot: Garmin Reactor 40 Autopilot with SmartPump 
  • VHF Radio: Icom Marine VHF radio with DSC and digital antenna
  • Stereo: Garmin Fusion Marine audio system with helm remote & cockpit/cabin speaker
  • Exterior lighting: remote controlled spotlight, LED light bar, and underwater lights

 Deck, Cockpit & Fishing Features

  • Helm & Seating: Adjustable captain's chair with flip-up bolster, portside companion lounge seating, and foldaway aft bench.
  • Enclosure: Hardtop with integrated rod holders, skylights, and full eisenglass helm enclosure.
  • Livewell: Insulated transom livewell with light and recirculating pump.
  • Fish Boxes: In-deck insulated fish boxes with pump-out systems (port and starboard).
  • Tackle & Prep: Bait prep station with sink, freshwater washdown, and tackle drawers.
  • Rod Storage: Gunwale-mounted rod holders, hardtop rocket launchers, and under-gunwale storage racks.
  • Anchoring: Electric anchor windlass with bow roller and deck foot switches.

Cabin Accommodations

  • Forward V-Berth: Converts from a dinette with a solid wood table into a spacious double berth.
  • Mid-Cabin Berth: Full double berth located beneath the helm sole.
  • Galley: Single-burner stove, microwave oven, Corian countertop, stainless steel sink, and 12V/110V refrigerator/freezer.
  • Enclosed Head: VacuFlush toilet, solid surface vanity, shower fixture, and holding tank level indicator.
  • Wood Trim: Cherry wood interior cabinetry in pristine condition.

Recent Service Records

  • Full exterior detail, April 2026
  • New bottom paint, July 2025
  • New starboard lower unit July 2025

No trailer

Disclaimer

We provide this yacht listing in good faith, and although we cannot guarantee its accuracy or the condition of the boat. The Listed by Kusler YachtsTHIS BOAT IS SUBJECT TO AN EXCLUSIVE LISTING AGREEMENT WITH KUSLER YACHTS 858-232-4101 AND IS NOT OFFERED FOR SALE BY SOUTH JERSEY YACHT SALES - CCM. South Jersey Yacht Sales - CCM is merely providing this information in an effort to represent you as a buyer in the purchase of this vessel. She is subject to prior sale, price change, or withdrawal without notice and does not imply a direct representation of a specific yacht for sale.

MANUFACTURER: Boston Whaler

BOAT TYPE: Saltwater Fishing

MODEL: 305 Conquest

HULL MATERIAL: Fiberglass

YEAR: 2005

CATEGORY: Power

BEAM: 10.58 ft

LENGTH: 30 / 9.14 m

DRY WEIGHT: 8,500 lb

ENGINE 1

MAKE: Mercury

MODEL: Verado

FUEL: unleaded

POWER: 250 HP

TYPE: Outboard 4 Stroke

HOURS: 1000

LOCATION: N/A

DRIVE: N/A

PROPELLER TYPE: N/A

YEAR: 2005

ENGINE 2

MAKE: Mercury

MODEL: Verado

FUEL: unleaded

POWER: 250 HP

TYPE: Outboard 4 Stroke

HOURS: 1000

LOCATION: N/A

DRIVE: N/A

PROPELLER TYPE: 3 Blade

YEAR: 2005

FUEL TANK CAPACITY: 300 gallons

FUEL TANK COUNT: 1

WATER TANK CAPACITY: N/A

WATER TANK COUNT: N/A

HOLDING TANK CAPACITY: N/A

HOLDING TANK COUNT: N/A

Disclaimer

The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.